Infrastructure support for investors
Partial compensation for infrastructure costs in the territory where the investment project is being implemented.
- supporter
- Compensation
- appointment
- Infrastructure
- accounting
- After the contract
What does the program do?
- Support covers roads, water and gas, irrigation, drainage, electricity and telecommunications.
- The costs of creating the infrastructure necessary for the project under the terms of the program are compensated.
Who's right for?
- Investors
- Resident companies
Format of support
- Compensation
Conditions and requirements
- Investments in the construction or reconstruction of real estate and the acquisition of fixed assets, including delivery and installation, are taken into account.
- The cost of infrastructure construction is not included in the total cost of investment.
- The basis is investments made after the conclusion of the contract under the program; for individual horticultural projects, 50% of the corresponding investments are taken into account.
How to Get Support
First, sign an agreement with the Ministry of Economy of Armenia, then implement the project and build the infrastructure. Partial reimbursement of expenses is provided after checking the final report according to Resolution No. 1343-N.
-
01
Check the company, site and activities
Commercial organizations registered in Armenia can participate, including jointly. The project should be located outside the first and second cadastral zones of Yerevan and belong to activity codes A, C, H 52, I or J 63.1. The registered right to the site must cover the project term. Check the restrictions on the combination of support under paragraph 1.1 of the decree.
-
02
Describe the project and agree on the infrastructure
Fill out Forms 1 and 2 to Resolution No. 1343-N. Prepare technical specifications, estimates and information about the future owner and operator of the infrastructure. Expenses that the operator will subsequently reimburse are not suitable. In a joint application, a description of the project is required from each company.
-
03
Submit an application and enter into a contract
Send the kit to the Ministry of Economy on secretariat@mineconomy.am or on paper. The inspection takes 10 working days; in the absence of shortcomings, the conclusion of a contract within a month is provided. To correct an incomplete set give 5 working days. Repeated incompleteness leads to rejection. Support depends on the available budget.
-
04
Perform the project within the terms of the contract
Agree in the contract the beginning and completion of work. As a general rule, investments are taken into account after its conclusion. Complete the entire project and construction in compliance with building codes and connection rules. Keep confirmation of expenses and volumes of work; notify the Ministry of changes in the information of the application.
-
05
Prepare a report for compensation
Send to the Ministry a report confirming the implementation of the project, the act of commissioning the infrastructure and documents on costs. For infrastructure under connection contracts, instead of construction costs, the connection fee is confirmed. The report shall be prepared and approved by an audit organization that meets the requirements of paragraph 20: check its experience and qualifications of the auditor in advance.
-
06
Wait for the decision of the commission and the payment
The Ministry shall transmit the report to the Commission within 10 working days; the Commission shall approve or reject it within 10 working days. After approval, payment is provided within a month. On the date of application and receipt of support, there should be no administrative proceedings to recover unfulfilled tax obligations.
What to collect for the application for participation
- Application in Form No. 1 and description of the investment project in Form No. 2: company, site, activity, amount of investments and schedule.
- Infrastructure projects, technical specifications, feasibility studies and technical specifications; if necessary, the operator's consent for maintenance, for irrigation, water users' society.
- Information about the future owner and operator; cost assessment, including land or easement, design, author's and mandatory technical supervision.
- Documents confirming the registered right to land or site.
A short list to prepare. Check the full set with Appendix 4.
Where to start now
Start with a cadastral zone, activity code, and two separate budgets: an investment project and infrastructure. Before submitting, check with the Ministry of Economy the availability of funding and requirements for the registration of an electronic kit.
Similar programmes
Investment and finance
Support for securities issuance and credit ratings
Measure for capital market development: supports the issuance of bonds and stocks, as well as obtaining an international rating.
- bondage
- up to 30 million ⁇
Production
Productivity programme
Support for the modernization of production facilities and the introduction of new technologies through subsidizing interest on loans or leasing.
- financing
- up to 1 billion ⁇
Production
Support for manufacturers of economically complex products
Three-stage support for projects to create or expand the production of products with high added value.
- capitalization
- from 1 billion ⁇